A Day in the Life of a CAM Programmer using our AI Agent: Titanium Pylon Rib in NX

October 26, 2026

The first strategy would have put the cutting tool at risk. The second was slower, but kept the tool safe. Our agent then pushed the feed rate, within safe limits, to bring the cycle time down.

Two roughing strategies for a titanium pylon rib in Siemens NX. Our agent analysed each as a chain of operations, recommended one against the CAM engineer’s priorities, then wrote the approved changes into NX and re-analysed the result, all at the desk, before the first cut.

Pocket 1 on a titanium pylon rib is to be roughed on a Hermle C52 at a 100 µm roughing tolerance. Two strategies have been programmed in NX, and each is a pair of operations: a main bulk roughing toolpath, then a dynamic corner toolpath with an Ø8 cutter to clear the stock the main tool cannot reach.

Strategy 1 is a high feed rough with a Ø40 tool. Strategy 2 is an adaptive rough with a Ø25 tool. This is how our AI agent, worked through them with the CAM engineer, and three things stand out:

  • The engineer stays in charge. Our agent works to the priorities the engineer sets, explains its reasoning, and changes nothing without approval.
  • Approved changes go straight into NX and straight back into analysis. Our agent writes the modified operation into NX, brings the new toolpath back into DigitalCNC and re-analyses it, so the result is checked before anyone leaves the desk.
  • A strategy can be judged as a chain, not just a single toolpath. The stock each operation leaves behind decides how the next one cuts, and our agent takes the whole chain into account.

The CAM engineer sets the priorities

The brief to our agent was a single paragraph: analyse the two strategies in pairs on the Hermle C52 at 100 µm, and recommend the more suitable one with any changes. Surface integrity and cutting tool security are the primary focus; cycle time is secondary.

Initial analysis request

That brief defines what “best” means for this part, and our agent works to it rather than to a generic score. With cycle time as the priority, the same strategies could rank the other way round. Our agent therefore went beyond a machine-specific cycle time on the C52 and ran the cutting simulation with engagement measured, because cycle time alone cannot answer a brief about tool security and surface integrity.

When roughing is a chain of operations

Many roughing strategies are built as a sequence of operations, and both strategies here are: a main bulk roughing toolpath, then a corner toolpath that cuts from whatever stock the main one leaves. How hard the Ø8 works, and for how long, depends on what it is handed.

Our agent modelled exactly that, running each main toolpath from raw stock and each corner toolpath from the in-process stock its own main toolpath actually left.

Strategy 1 – High Feed

Strategy 2 – Adaptive

Strategy 1: quick on the clock, hard on the chain

At 15:27 in total (13:04 main, 2:22 corners), Strategy 1 looks like the obvious choice. But the Ø40 enters each level as a closed slot with no exit for the chips, 22 times, and between lines 513 and 578 it cuts 27.5 mm deep at full width, peaking at 16,707 mm³/s.

It then leaves 9,105 mm³ in the corners for the Ø8. The corner pass runs a mean chip of just 0.024 mm, below both the amber and red chip thickness limits set by the Engineer, so the cutter rubs instead of shearing. In titanium, that work-hardens the corner walls and shortens tool life.

Strategy 1 – High Feed – in DigitalCNC

Strategy 2: slower, but a far easier hand-off

Strategy 2 takes 37:43 as programmed (36:16 main, 1:26 corners). Its Ø25 adaptive toolpath holds a light, steady 3.1 mm radial engagement, peaking at 839 mm³/s with no analysis warnings, and leaves 5,043 mm³ in the corners, 44% less than Strategy 1.

Strategy 2 – Adaptive – in DigitalCNC

Why the chain changes the answer

Looked at in isolation, the two corner toolpaths are almost identical, peaking at 450 and 455 mm³/s. What separates them is what they were handed: Strategy 1’s corner toolpath has 80% more material to clear and spends longer rubbing. That only shows when each is simulated from its own main toolpath’s stock, which is why our agent judged them as pairs.

Our agent recommends, the engineer decides

Our agent recommended Strategy 2, with every point traced back to a measured number or a line in the program:

  • Tool security: no closed-slot entries or deep full-width moves, and a peak removal rate around 20 times lower than Strategy 1’s.
  • Surface integrity: steady radial load into the pocket walls, instead of sudden steps that cause deflection and chatter.
  • The corner hand-off: 44% less stock for the most fragile tool in the job, and no corner toolpath below the red limit.
  • Cycle time: 22:16 slower, a cost our agent stated openly, placed second as the brief asked, and set out to reduce.

Strategy 2’s thin chips were the opportunity. At low radial engagement, chip thinning cut the main toolpath’s mean chip to 0.079 mm, and the corner toolpath sat at 0.024 mm, below the amber limit. After checking the live NX parameters, our agent proposed two feed changes, each showing the before and after values and its reasoning:

  • Main toolpath: 893 to 1,206 mm/min (+35%), restoring a chip of around 0.11 mm with engagement unchanged.
  • Corner toolpath: 1,074 to 1,343 mm/min (+25%), lifting the Ø8 out of rubbing.

Nothing changes in NX until the engineer approves it. The evidence is on screen, and the final call stays with the person responsible for the part.

From approval to NX, and straight back into analysis

Once approved, the loop closed without anyone re-entering a value or re-exporting a file:

  1. Approved changes are written back to NX and re-analysed.
  2. Before and after are compared side by side.

Our agent’s recommendation

The geometry came back identical; only the chip and the clock moved. The main toolpath’s mean chip rose from 0.079 to 0.107 mm and its cycle fell from 36:16 to 26:58. The corner toolpath’s chip rose to 0.030 mm, clearing the amber warning, and its cycle fell from 1:26 to 1:12.

Strategy 2 went from 37:43 to 28:11: 9:32 recovered, a quarter of the cycle, narrowing the gap to Strategy 1 from 22:16 to 12:44 with tool security and surface integrity intact.

The strategies, side by side

Pocket 1 roughing on a titanium pylon rib, Hermle C52, 100 µm roughing tolerance. Each corner pass is simulated from the in-process stock left by its own main pass.

What this means for the CAM engineer

Comparing strategies as a chain, on load, chip thickness and the stock each toolpath hands to the next, normally means chained simulations and tracing moves back to source lines, which rarely happens before the first-off. With our agent it took minutes at the desk, not a slot on the machine.

The engineer set the priorities and approved every change. The physics-based simulation did the analysis; our agent interpreted it, made the recommendation, wrote the changes into NX and had the result re-analysed through the whole chain. Underneath, the prediction is deterministic and physics-based: the same toolpath on the same machine gives the same answer, before anything is cut.

The quickest strategy on the clock handed the most fragile tool the hardest job. Our agent saw it through the chain, the engineer made the call, and 9:32 came back out of the safer strategy without changing a single move of the toolpath.